Cost Overview - Introduction

Cost Overview dashboards provide visibility and insights into various metrics generated at cluster/project level. They provide a bird’s eye view of costs and efficiencies for Projects, Clusters and Namespaces. Access is controlled by assigned role. Longer-term retention of historical cost information makes it possible to anticipate future expenses.

Getting to the Dashboards - Cost Overview

The Cost Overview dashboard card shows resource cost summary and a trend graph, which is helpful to view service provider vs utilization costs

Mouse hover on the tooltip (i) of each cost widget to know more about the metrics.

Widgets

Note: Control plane cost for AKS clusters is not supported for imported clusters that are not managed. Additionally, the cost profile used for AKS clusters should be a custom cost profile exclusively.

Cost Trend Legend

Cost Trend has a graphical representation to show the trend of different costs. A legend is presented at the bottom of the graph with different colors to identify the cost type costs. Select the cost (Total, Compute, Control Plane) available in the right corner to view the cost metrics of a specific cost type. Mouse hover on the graph to know the detailed cost metrics for each hour.

Based on the provider selection, the cost trend differs.

Top Resources

Click the ellipsis icon against each widget to view all the available clusters, namespaces, and applications along with the cost.

Project Level Cost Metrics

Select the Project tab to view the cost of metrics at project level. Select the required project from the drop-down and here you can view the cost details of all the clusters available within the selected project.

The Unallocated Cost will be empty if the selected project is not the parent project for any clusters.


Cluster Level Cost Metrics

Select the Clusters tab to view the cost of metrics at cluster level. Select the required Provider, Project, and Cluster from the drop-down and here you can view the cost details of all the clusters available within the selected project.

The Unallocated Cost will be empty when you select a project and a shared cluster.